During the PI planning event when are planning adjustments agreed upon

At the beginning of January, ENAV, DSNA and skyguide members met remotely for the first SAFe event, the PI (Program Increment) Planning. This is a major event of the scaled Agile methodology that Coflight Cloud Services is currently implementing. Here is how it happened, the objectives and the commitments of the teams.

PI Planning: How does it work?

The PI Planning is organised over a day and a half with the support of Sopra Steria Group‘s Agile coach. All CCS members are invited. The goal is to agree on a planning and objectives for the next period (15 weeks divided into 3-5 weeks sprints). The PI Planning is part of a recurrent process that repeats itself every 15 weeks. This particular one marked the launch of Step 2.

The aim of this event was to align all CCS members with a common vision and the collaborative elaboration of objectives built and shared during the planning, design of teams planning for the next 3 sprints and identification of major risks and structural dependencies.

Organisation and timing of such an event is essential; the agenda that the CCS teams experienced is as follows:

  • First half-day: top-down information sharing session. Samuel Stambach from skyguide presents his expectations, Guillaume Ramonet explains the CCS vision, then Valentina Piccineli and Laura De Stefani present the Agile framework and the planning. Charlotte Chambellin shares the intended scope for this Business Solution, and Quentin Grandjean with Enzo Amadio present the system architecture.
  • Second half-day: first group working session. All teams prepare a first iteration of their planning, risks and objectives. At the end of the day, each team perform a draft plan review to make it possible for stakeholders at program level to negotiate potential scope and planning adjustments and resolve problems and impediments during the next management review
  • Last half-day: second iteration. The teams take action and finalize their plan, making the appropriate needed adjustments. Presentation of the Final Plan Review by all the teams, risk analysis and conclusion by the management.

To summarize, here are the key elements of the PI Planning:

  • Definition of the schedule, objectives, vision
  • Definition of the scope: prioritize program level elements
  • Major outcomes: teams plan (including dependencies), objectives and risks

At the end of the event, the teams commit to a number of actions to be carried out during the next PI in agreement with management based on respective business value assessment.

Motivating the teams

PI Planning is an exercise requiring transparency and alignment. Management teams explain company’s challenges that must be addressed by all the teams and the strategic themes covering these challenges.

This end-to-end understanding regarding value creation of each teams work and each team members is fundamental for the motivation. The emulation created by collaborative work during this day and a half, both within each team and between teams, creates a real esprit de corps, prerequisite to achieving the Step 2 objectives.

The availability of key people to arbitrate, discover and understand the ideas that the teams have to take on board is fundamental. The quality of the teams work and their ability to commit greatly depends on the presence of these key people during the teamwork.

Due to COVID-19 crisis, this event had to be held remotely. Good communication is even more essential during such a remote event. Then collaborative and digital tools have been used to facilitate this and to make it possible, such as Klaxoon and Microsoft Teams.

Everyone enjoyed working with these tools and will continue using it and enhance the various digital boards they created. The fluidity and ease of use of such tools is essential for the successful completion and total involvement of the teams despite the particular context.

Results of the event

The teams leave the event with a committed plan for the next program increment (15 weeks) and objectives agreed with business owners. This work should enable them to quickly build their Sprint Boards, identify dependencies with other teams and identify the risks to be addressed (classification, appointment of a person responsible, action plan).

The program management team leaves with a Program Board that reflects the commitment of the teams to deliver during the first program increment, objectives that summarize the commitment of the teams and a list of risks to be managed.

The business owners leave with the assurance of the commitment and understanding of the teams with regard to their issues.

Benefits of PI Planning

Here are the various benefits for organizing such an event:

  • Creating direct communication between team members and stakeholders
  • Building a real social network around the Agile methodology
  • Aligning developments with the business context, vision, teams and program objectives
  • Identifying dependencies and encourage collaboration between teams.
  • Quick decision-making thanks to the presence of all necessary stakeholders

Next steps for CCS teams

This event allows an important sharing of information, as well as a short and medium term vision of the teams’ activities. Following this event, weekly meetings called ART Sync are set up to ensure a follow-up of the PI progress and raise potential problems or impediments making sure they are quickly dealt in a collaborative way.

At the end of this first PI, CCS teams will participate in another important event: the Inspect and Adapt. During this event : teams present what they have achieved during the PI; At program level, relevant KPIs are presented and all members take part in a problem solving workshop where they collectively agree on improvement for CCS program.

During the course of this PI, Product Management and System Architect teams prepare next PI planning scope with the help of all relevant stakeholders (CCS members and potential external key resources).

To conclude, this first remote event went very well and feedbacks are good. Communication between all participants was fluid and many discussions took place between the different teams. This event made it possible to identify the level of maturity of each stakeholders, as well as their expectations.

The CCS teams are already well on their way to ensuring the deployment and success of Step 2, thanks to the excellent collaboration between ENAV, skyguide and the DSNA.

During the PI Planning event, when are planning adjustments...

During the PI Planning event, when are planning adjustments communicated back to the Agile Release Train?

During the draft plan review

During breakout sessions

At the end of day one

At the beginning of day two

Answer & Explanation

During the PI planning event when are planning adjustments agreed upon
Solved by verified expert

nec facilisis. Pellente

, ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam lacinia pulvinar tortor nec facilisis. Pellentesque dapibus efficitur laoreet. Nam risus ante, dapibus a molestie consequat, ultrices ac magna

Unlock full access to Course Hero

Explore over 16 million step-by-step answers from our library

Subscribe to view answer

Step-by-step explanation

itur laoreet. Nam risus

e vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam lacinia pulvinar tortor nec facilisis. Pellentesque dapibus efficitur laoreet. Nam risus ante, dapibus a molestie consequat, ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, di

If you are planning or preparing for Leading SAFe 5.1 (Scaled Agile Framework) certification then this article is for you to get started.

Roadmap is a script of critical moves, which gives best results when follow in same sequence to implement SAFe:-

  1. Reaching the Tipping Point
  2. Train Lean-Agile Change Agents
  3. Train Executives, Managers, and Leaders
  4. Create a Lean-Agile Center of Excellence
  5. Identify Value Streams and ARTs
  6. Create the Implementation Plan
  7. Prepare for ART Launch
  8. Train Teams and Launch the ART
  9. Coach ART Execution
  10. Launch More ARTs and Value Streams
  11. Extend to the Portfolio
  12. Accelerate
What are different stages of technological revolution?
  1. Installation Period – New technology and financial capital combine to create a ‘Cambrian explosion’ of new market entrants, disrupting entire industries from the previous age
  2. Turning Point – Existing businesses either master the new technology or decline and become relics of the last age
  3. Deployment Period – Production capital of the new technological giants start to take over
What are the dual operating system for Business Agility?
  1. Functional hierarchy for efficiency and stability
  2. Value Stream network for the speed of innovation

SAFe is a second operating system around streams, without disrupting the existing hierarchy.

Why SAFe?
  • 30% Happier, more motivated employees
  • 35% Increase in productivity
  • 50% Faster time-to-market
  • 50% Defect reduction
What are the four SAFe configurations provide the right configuration for each Enterprise?
  1. Essential = Agile Team + Program
  2. Large Solution = Agile Team + Program + Solution
  3. Portfolio = Agile Team + Program + Portfolio
  4. Full = Agile Team + Program + Solution + Portfolio
What are the 7 SAFe core competencies to achieve business agility?
  1. Team and Technical Agility has 3 Components:-Agile TeamsTeams of Agile Teams (ART)

    Built-In Quality

  2. Agile Product Delivery has 3 Dimensions:-Customer Centricity and Design ThinkingDevelop on cadence and release on demand

    DevOps and the Continuous Delivery Pipeline

  3. Enterprise Solution Delivery has 3 Dimensions:-Lean System and Solution EngineeringCoordinate ARTs and Suppliers

    Continually Evolve Live Systems

  4. Lean Portfolio Management has 3 Dimensions:-Strategy & Investment FundingAgile Portfolio Operations

    Lean Governance

  5. Organizational AgilityLean-thinking People and Agile TeamsLean Business Operations

    Strategy Agility

  6. Continuous Learning CultureLearning OrganizationInnovation Culture

    Relentless Improvement - Inspect & Adapt (I&A) - Plan Do Check Adjust

  7. Lean-Agile Leadership has 3 Dimensions:-Leading by ExampleAlign Mindset & Lean-Agile Principles

    Leading the Change to new ways of Working

How to measure the business agility?
  1. Flow metrics help determine how fast is the value stream at creating and delivering value
  2. Outcome metrics help ensure that what has been delivered, provides benefit to the customer and to the business. Value Stream KPIs are primarily used to measure these outcomes.
  3. Measuring the level of organizational Competency is accomplished via two separate assessment mechanisms also called Measure and Grow:-
    • The SAFe Business Agility Assessment is designed for LPM and portfolio stakeholders to evaluates their portfolio’s progress toward Business Agility and determines their next improvement steps.
    • The SAFe Core Competency Assessments are used to help teams and trains improve on the technical and business practices they need to help the portfolio achieve that larger goal.

Lesson 2: Becoming a Lean-Agile Leader

What are the four SAFe core values?
  1. Alignment
  2. Built-in Quality
  3. Transparency
  4. Program Execution
What are the components of SAFe House of Lean?
  1. Value (The best quality and value to people and society, High morale, safety and Customer delight)
  2. Respect for People and Culture (Generative culture, People do all the work, Your Customer is whoever consumes your work, Build long-term partnerships based on trust, To change the culture, you have to change the organization)
  3. Flow (Optimize sustainable value delivery, Build in quality, Understand, exploit and manage variability, Move from projects to products)
  4. Innovation (Innovative people, Provide time and space for innovation, “Go see”, Experimentation and feedback, Innovation riptides, Pivot without mercy or guilt)
  5. Relentless Improvement (A constant sense of danger, Optimize the whole, Problem-solving culture, Base improvements on facts, Reflect at key Milestones)
  6. Leadership (Lead by example, Adopt a growth mindset, Exemplify the values and principles of Lean-Agile and SAFe, Develop people, Lead the change, Foster psychological safety)
╔═════════════════════════════════════════════════════════════════╗ ║ Value ║ ╔═║ ║═╗ ╚═══╗ Respect ╔═══╗ ╔═══╗ ╔═══╗ ╔═════╝ ║ for ║ ║ ║ ║ ║ ║ Relentless ║ ║ People ║ ║ Flow ║ ║ Innovation ║ ║ Improvement ║ ║ and ║ ║ ║ ║ ║ ║ ║ ╔════╝ Culture ╚═══╝ ╚═══╝ ╚═══╝ ╚═════╗ ║ ║ ║ Leadership ║ ╚══════════════════════════════════════════════════════════════════════╝
What is Agile Manifesto?

Agile Manifesto uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value:

  • Individual and interactions over processes and tools
  • Working software over comprehensive documentation
  • Customer collaboration over contract negotiation
  • Responding to change over following a plan
    That is, while there is a value in the items on the right, we value the items on the left more
What are the 12 Agile Manifesto Principles?
  1. Our highest priority is to satisfy the customer through early and continuous delivery of valuable software.
  2. Welcome changing requirements, even late in development. Agile processes harness change for the customer’s competitive advantage.
  3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference for the shorter timescale.
  4. Business people and developers must work together daily throughout the project.
  5. Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done.
  6. The most efficient and effective method of conveying information to and within a development team is face-to-face conversation.
  7. Working software is the primary measure of progress.
  8. Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.
  9. Continuous attention to technical excellence and good design enhances agility.
  10. Simplicity – the art of maximizing the amount of work not done – is essential.
  11. The best architectures, requirements, and designs emerge from self-organizing teams.
  12. At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly.
What are the 10 SAFe Lean-Agile Principles?
  1. Take an economic viewAgile economics: deliver early and oftenDeliver value incrementally,Early delivery has higher market value

    Economic Trade-offs parameters: Lead time, Product cost, Value, Development expense, and Risk

  2. Apply systems thinkingOptimizing a component does not optimize a systemFor the system to behave well as a system, a higher-level understanding of behavior and architecture is required The value of a system passes through its interconnectionsA system can evolve no faster than its slowest integration point

    Focus on the delays and reduce them

  3. Assume variability; preserve options
    Flexible requirements and design, the Cone of uncertainty, set-based over point-based approach
  4. Build incrementally with fast, integrated learning cyclesPDCA = Plan – Do – Check – Adjust, The shorted the cycles, the faster the learning

    Integration points control product development and reduce risk

  5. Base milestones on objective evaluation of working systemsPhase-gate milestones force design decisions too early, false-positive feasibility, they assume a point Solution exists, huge batches and long queues, centralized requirements and design.

    Use Objective milestones instead, PI System Demos, continuous, cost-effective adjustments towards an optimum Solution)

  6. Visualize and limit WIP, reduce batch sizes, and manage queue lengthsReduce batch size for higher predictability. Total cost = Holding cost + Transaction cost. Reduce transaction costs increases predictability, accelerates feedback, reduces rework, lowers cost.

    Little’s Law: Wq = Lq / Lambda, Average wait time = Average queue length / Average processing rate

  7. Apply cadence, synchronize with cross-domain planning
    Cadence – converts unpredictable events into predictable occurrences and lowers cost, makes waiting times for new work predictable, supports regular planning and cross-functional coordination, limits batch sizes to a single interval, controls injection of new work, provides scheduled integration points;
    Synchronization – causes multiple events to happen simultaneously, facilitates cross-functional trade-offs, provides routine dependency management, supports full system integration and assessment, provides multiple feedback perspectives
  8. Unlock the intrinsic motivation of knowledge workersWorkers are most qualified to make decisions about how to perform their workThe workers must be heard and respected for management to lead effectivelyKnowledge workers must manage themselves. They need autonomyContinuing innovation must be part of the work, the tasks, and the responsibilities of knowledge workers.

    Unlocking intrinsic motivation with autonomy, mastery, and purpose

  9. Decentralize decision-making
    Centralize – Infrequent, Long-lasting, Significant economies of scale
    Decentralize – Frequent, Time critical, Requires local information
  10. Organize around valueValue doesn’t follow silos

    Organize around Development Value Streams.

Why focus on the SAFe Lean-Agile Principles?
  • A Lean-Agile transformation will deliver substantial benefits
  • However, it is a significant change, and every implementation is different
  • Leaders should understand why the practices work; it’s part of ‘knowing what it is they must do’
  • If a practice needs to change, understanding the principles will assure the change moves the Enterprise in the right direction

Lesson 3: Establishing Team and Technical Agility

What is Agile team?

Agile teams are cross-functional and self-organizing group of 5 to 11 people, that can define, build, test, and where applicable, deploy increments of value in short time boxes of two weeks called Iterations.

Team contains two specialty roles:-

  1. Scrum Master - coaches the team in self-management; helps the team focus on creating increments of value; removes impediments; ensures that all team events take place, are productive and kept within the timebox
  2. Product Owner - contributes to the Vision and Roadmap; acts as the Customer for team questions; creates, clearly communicates and accepts stories;prioritizes the backlog

Team responsibilities are:-

  1. Create and refine Stories and acceptance criteria
  2. Develop and commit to team PI Objectives and Iteration Goals

Team execute Iterations with Scrum. Iteration Events are:-

  • Iteration Planning
  • Daily Standup
  • Iteration Review
  • Iteration Retrospective
  • Backlog Refinement

Team visualize flow with Kanban

What is Agile Release Train (ART)?

ART is a cross functional, virtual organization of 5-12 teams (50-125+ individuals), synchronized on common cadence, a Program Increment (PI), aligned to a common mission via a single program backlog. ART Events are:-

  • Pre and Post PI Planning
  • PI Planning
  • ART Sync (Weekly or more frequently, 30–60 minutes) - consist of Scrum of scrums and PO Sync
  • System Demo (Occurs at the end of each Iteration in PI)
  • Solution Demo (Occurs at the end of each PI) - presents the combined development effort of multiple ARTs and Suppliers
  • Inspect & Adapt (Occurs at the end of each PI)

ART are organized for flow:-

  • Stream-aligned team – organized around the flow of work and has the ability to deliver value directly to the Customer or end user.
  • Complicated subsystem team – organized around specific subsystems that require deep specialty skills and expertise.
  • Platform team – organized around the development and support of platforms that provide services to other teams.
  • Enabling team – organized to assist other teams with specialized capabilities and help them become proficient in new technologies.

Roles on the Agile Release Train:-

  • Release Train Engineer acts as the Chief Scrum Master for the train.
  • Product Management owns, defines, and prioritizes the Program Backlog.
  • System Architect/Engineering provides architectural guidance and technical enablement to the teams on the train.
  • The System Team provides processes and tools to integrate and evaluate assets early and often.
  • Business Owners are key stakeholders on the Agile Release Train.

Lesson 4: Building Solutions with Agile Product Delivery

What is Design Thinking?

Design Thinking is a clear and continuous understanding of the target market, Customers, the problems they are facing, and the jobs to be done.

  • Understand the problem - Use Personas and Empathy Maps to understand customers
  • Design the right solution (Desirable, Viable, Feasible, Sustainable) - Use Journey Maps to design end-to-end customer experience and Story Maps to capture workflows
What is Program Backlog?

The Program Backlog is the holding area for upcoming Features that will address user needs and deliver business benefits for a single Agile Release Train (ART).

What is Feature?
  • Features are maintained in Program Backlog
  • Feature are sized to fit in a Program Increment (PI) and delivered by a single Agile Release Train (ART)
  • Features are split into Stories and fits in one Iteration for one team
  • Features includes a definition of Minimum Marketable Feature (MMF), a benefit hypothesis (to justify development cost) and Acceptance criteria (defined during program backlog refinement).
  • Features are prioritized using WSJF and top 10 features are presented to the team during PI planning
  • Typically Product Management creates business features and System Architect creates enabler features
What is Capability?
  • Capabilities are maintained in Solution Backlog
  • Capabilities are sized to fit in a Program Increment (PI) and delivered by multiple Agile Release Trains (ARTs)
  • Capabilities includes a Phrase, a benefit hypothesis and Acceptance criteria
How to prioritize Program Backlog for optimal ROI?

Using Weighted Shortest Job First (WSJF)

Cost of Delay (CoD) WSJF = ----------------------- Job Duration (Job Size) CoD = User-business + Time + Risk reduction and/or value criticality opportunity enablement
What is Program Increment (PI) and its Events?

PI is time boxes, typically 5 iteration long. Usually 5th Iteration is in a PI is called Innovation and Planning (IP) Iteration.

Events are:-

  • PI Planning - facilitated by Release Train Engineer (RTE) for 2 days every typical 10 weeks, Product management provides vision and backlog, System architect provides architectural guidance, Teams of agile team plan the work and visualize on Program board. Outcome is Team/Program PI Objectives and Program board. Business Owner assign business value to PI Objectives on a scale of 1 to 10.
  • System Demo - ART demo integrated solution after each Iteration
  • Inspect & Adapt - Retrospect at the end of PI, product management understand customer’s problem and find desirable, viable, feasible, and sustainable solution.
What is PI Uncommitted Objectives?

Uncommitted objectives are used to identify work that can be variable within the scope of a PI. The work is planned, but the outcome is simply not certain. Teams can apply uncommitted objectives whenever there is low confidence in meeting the objective. This can be due to many circumstances:

  • Dependencies with another team or supplier that cannot be guaranteed.
  • The team has little to no experience with functionality of this type. In this case the teams may plan ‘Spikes’ early in the PI to reduce uncertainty.
  • There are a large number of fairly critical objectives that the business is depending on and the team is already loaded close to full capacity.
What is CALMR approach to DevOps?
  • Culture - Establish a culture of shared responsibility for development, deployment, and operations.
  • Automation - Automate the Continuous Delivery Pipeline.
  • Lean flow - Keep batch sizes small, limit WIP, and provide extreme visibility.
  • Measurement - Measure the flow through the pipeline. Implement full-stack telemetry.
  • Recovery - Architect and enable low-risk releases. Establish fast recovery, fast reversion, and fast fix-forward.
How to build Continuous Delivery Pipeline with DevOps?
  • Continuous Exploration - Understand Customer needs - Hypothesize, Collaborate & Research, Architect, Synthesize
  • Continuous Integration – A critical technical practice of the ART - Develop, Build, Test End-to-End, Stage
  • Continuous Deployment – Getting to production early - Deploy, Verify, Monitor, Respond - Deploy to Staging every Iteration, Automate deployment, Automate testing of features and NFRs, Decouple deployment from release
  • Release on Demand - Release, Stabilize, Measure, Learn
What is Architectural Runway?

Architectural Runway is existing code, hardware components, marketing branding guidelines, etc., that enable near-term business Features. Enablers build up the runway to support Features for e.g. A single sign-on mechanism will enable sign-on in multiple applications.


Lesson 5: Exploring Lean Portfolio Management

What is SAFe Portfolio?
  • SAFe Portfolio is a collection of Value Streams for a specific business domain in an Enterprise.
  • An Enterprise may have a single portfolio or multiple portfolios
  • Each value stream can have multiple Solution trains and Agile release trains.
  • The portfolio canvas is a template for identifying a specific SAFe portfolio. One of the primary uses of the canvas is to record the current state of the portfolio
What is Portfolio Epic?

Epics are defined at portfolio level, they are typically cross-cutting and spanning multiple Value Streams and PIs. There are two types:

  1. Business Epics directly deliver business value
  2. Enabler Epics support the Architectural Runway and future business functionality

Epics need a Lean business case, the definition of a minimum viable product (MVP), an Epic Owner, and approval by LPM.

Epics are described with four major fields:

  • Value statement
  • Business outcomes hypothesis
  • Leading indicators
  • Nonfunctional requirements
What is Strategic Themes?

Strategic themes provide a mechanism to align the business objectives of an enterprise to SAFe portfolio. They influence portfolio strategy and provide business context for portfolio decision-making. Strategic themes are direct inputs to the portfolio vision.

Strategic themes can be defined by a phrase or by using the Objectives and Key Results (OKRs) template.

What is Lean Budget?

Funding Value Streams, not projects. Expenses across a PI are fixed and easy to forecast

What is Participatory Budgeting?

Participatory Budgeting (PB) is the process that Lean Portfolio Management (LPM) uses to allocate the total portfolio budget to its value streams.

The Enterprise provides a portion of its total budget to each portfolio. In turn, Lean Portfolio Management (LPM) allocates the portfolio Budget to individual Value Streams. The value streams fund the people and resources needed to achieve the current Portfolio Vision and Roadmap. Empowered Agile Release Trains (ART) advance Solutions and implement Epics approved by LPM.


Lesson 6: Leading the Change

What are the characteristics of a Leader?
  • Authenticity
  • Emotional intelligence
  • Lifelong learning
  • Growing others
  • Decentralized decision-making
Steps for Leading successful change?
  • Establish a sense of urgency
  • Create a powerful guiding coalition
  • Develop the vision and strategy
  • Communicate the vision
  • Empower employees for broad-based action
  • Generate short-term wins
  • Consolidate gains and produce more wins
  • Anchor new approaches in the culture

Go through the below list of complied questions from Leading SAFe certification exam. You can expect the similar questions in the real exam. If you are looking for exam dumps then you can rely on below list of questions though exact same questions are not guaranteed to appear in the exam.

The network☒ The hierarchy

☒ The dual operating system

What is the ultimate goal of SAFe?

☒ Faster Delivery☒ Servant Leadership

Delivering Value


☒ Functional Teams

Which two areas are part of the Scaled Agile Framework Core Values? (Choose two.)

Alignment☒ Collaboration☒ Decentralize decision making

Built-in Quality


☒ Systems Thinking

What are two of the SAFe Core Values? (Choose two.)

Program execution
Transparency☒ Flow☒ Culture

☒ Relentless improvement

Which statement fits with the SAFe Core Value of Built-in Quality?

☒ Quality should only be worked on during the Innovation and Planning Iteration
You cannot scale crappy code☒ Quality is not part of the SAFe Core Values

☒ Quality depends on the scale of the project and should be implemented from the top down

The primary need for SAFe is to scale the idea of what?

☒ Technical Solution Delivery☒ Organizational and Functional Alignment☒ Lean Portfolio Management

Business Agility

What are the top two reasons for adopting Agile in an organization? (Choose two.)

Accelerate product delivery☒ Reduce changes☒ Centralize decision-making

Enable changing priorities


☒ Reduce project cost

What are the top two reasons for adopting Agile in an organization? (Choose two.)

☒ Increase predictability by reducing changes☒ Reduce risk by centralizing decision making

Enhance ability to manage changing priorities


Accelerate product delivery, Reduce project cost

According to SAFe Principle #10, what should the Enterprise do when markets and customers demand change?

☒ Create an Agile Release Train to focus on value☒ Create a reliable decision-making framework to empower employees and ensure a fast flow of value☒ Apply development cadence and synchronization to operate effectively and manage uncertainty

Reorganize the network around the new value flow

When should new approaches be anchored in an organization’s culture?

☒ Culture should not be changed because SAFe respects current culture☒ Culture change needs to happen before the SAFe implementation can begin

Culture change comes last as a result of changing work habits


☒ Culture change comes right after a sense of urgency is created in the organization

What is one output of enterprise strategy formulation?

Portfolio Budgets☒ Portfolio Governance☒ Portfolio Vision

☒ Portfolio Canvas

What is the biggest benefit of decentralized decision-making?

☒ Ensuring strategic decisions are not made in a vacuum
Delivering value in the shortest sustainable lead time☒ Creating better visualization

☒ Removing accountability from leaders

When should a decision be decentralized?

☒ If it’s long lasting
If it requires local information☒ If it provides large economies of scale

☒ If it’s infrequent

Which two types of decisions should remain centralized even in a decentralized decision-making environment? (Choose two.)

☒ Decisions that are made frequently☒ Decisions that come with a high cost of delay☒ Decisions that require local information

Decisions that deliver large and broad economic benefits


Decisions unlikely to change in the short term

How does Decentralized decision making Help?

☒ Limiting WIP☒ Reducing risks

Getting better Economic Value


☒ Reducing Defects

What is the basic building block when organizing around value?

Agile Teams☒ Hierarchies☒ Individuals

☒ Agile Release Trains

Which two quality practices apply to Agile teams? (Choose two.)

☒ Providing architectural runway
Peer review and pairing☒ Decentralized decision-making☒ Using nonfunctional requirements

Establishing flow

What are two ways to describe a cross-functional Agile Team? (Choose two.)

They are optimized for communication and delivery of value☒ They deliver value every six weeks☒ They are made up of members, each of whom can define, develop, test, and deploy the system

They can define, build, and test an increment of value


☒ They release customer products to production continuously

Who has content authority to make decisions at the User Story level during Program Increment (PI) Planning?

☒ Scrum Masters☒ Agile Team

Product Owner


☒ Release Train Engineer

What does the Product Owner do as part of the prep work for iteration planning?

☒ They collaborate with their team to detail stories with acceptance criteria and acceptance tests.
They review and reprioritize the backlog.☒ They elaborate backlogs into user stories for implementation.

☒ They build, edit, and maintain the team backlog.

What is found on a program board?

Features☒ User Stories☒ Tasks

☒ Epics

Which three items are found on a Program board? (Choose three.)

Significant dependencies
Milestones☒ Tasks☒ Backlog items

Features


☒ User Stories

The program board shows which two items? (Choose two.)

☒ Epics☒ Capacity and Load

Features


Significant dependencies
☒ Risks

What are two problems that can be understood from the Program Board? (Choose two.)

☒ Events for future PI
Too many dependencies leading to a single program milestone☒ Too much Work-in-Process in one Iteration☒ Too many Features are placed in a team’s swim lane with no strings

A significant dependency leading to a Feature

When looking at a Program Board, what does it mean when a feature is placed in a team’s swim lane with no strings?

That the feature can be completed independent from the other teams☒ That all the risks have been ROAMed☒ That the team has little confidence it will happen

☒ That the feature should be completed before any other feature

What is one of the Agile Release Train sync meetings?

☒ Solution Demo
Scrum of scrums☒ Iteration Retrospective

☒ Iteration Review

What are two of the Agile Release Train Sync meetings? (Choose two.)

Product Owner Sync☒ System Demo☒ Solution Demo

Scrum of Scrums


☒ Inspect and Adapt

Which statement is true about ART events?

☒ The daily stand-up is an ART event that requires the scrum of scrums and Program Owner sync involvement in the closed-loop system☒ The Inspect and Adapt is the only ART event required to create a closed-loop system

Team events run inside the ART events, and the ART events create a closed-loop system


☒ ART events run inside the team events, and the team events create a closed-loop system

Who facilitates PO Sync meeting?

Release Train Engineer☒ Product Owner☒ Business Owner

☒ Scrum Master

Who assign business value (BV) to the team PI Objectives?

☒ Release Train Engineer☒ Product Owner

Business Owner


☒ Scrum Master

Who decides the Team PI Objective Business Value scoring after negotiation?

☒ Product Manager☒ The Agile Team☒ The Scrum Team

Business Owner

Why do Business Owners assign business value to team PI Objectives?

☒ To determine the highest value using WSJF☒ To ensure the teams do not work on architectural Enablers

To provide guidance on the business value of the team objectives


☒ To override the decisions made in WSJF prioritization

Which team type is ‘organized to assist other teams with specialized capabilities and help them become more proficient in new technologies’?

☒ Stream-aligned team☒ Platform team☒ Complicated subsystem team

Enabling team

Why do teams have an Iteration Retrospective?

☒ To iterate on stories☒ To identify acceptance criteria

To adjust and identify ways to improve


☒ To evaluate metrics

The Agile Release Train uses which type of teams to get work done?

☒ Solution teams☒ Phased-review-process teams☒ Management teams

Cross-functional teams

Which role serves as the servant leader for the Agile Release Train?

☒ Business Owner
Release Train Engineer☒ Agile Coach

☒ Scrum Master

What is the focus of the Daily Stand-up meeting?

☒ PI objectives versus outcomes
Iteration goals versus what got done☒ Scrum Master goals versus Development Team goals

☒ Plan objectives versus Program Owner objectives

☒ Customer Support Representative☒ Product Owner☒ Release Train Engineer

Product Management

What is part of the role of Product Management?

To prioritize the Program Backlog☒ To prioritize Enablers☒ To facilitate backlog refinement sessions

☒ To assign business value to Features

Who is responsible for the Solution Backlog?

☒ Product Owners☒ Solution Train Engineer☒ Product Management

Solution Management

Which role accepts Capabilities as complete?

Solution Management☒ Product Management☒ Solution Architect/Engineer

☒ Solution Train Engineer

What portfolio-level role takes responsibility for coordinating portfolio Epics through the Portfolio Kanban system?

Epic Owners☒ Enabler Epic☒ Lean Portfolio Management

☒ Enterprise Architect

Who is responsible for managing the Portfolio Kanban?

☒ Release Train Engineer☒ Solution Management☒ Product Management

Lean Portfolio Management

The analyzing step of the Portfolio Kanban system has a new Epic with a completed Lean business case. What best describes the next step for the Epic?

It will be moved to the Portfolio Backlog if it receives a ‘go’ decision from Lean Portfolio Management☒ It will be implemented if it has the highest weighted shortest job first (WSJF) ranking☒ It will remain in the analyzing step until one or more Agile Release Trains have the capacity to implement it

☒ It will be implemented once the Lean business case is approved by the Epic Owner

You need someone on your team who will work across value streams and programs to help provide the strategic technical direction that can optimize portfolio outcomes. What portfolio-level must you fill?

☒ Scrum Master☒ Lean Portfolio Management☒ Epic Owners

Enterprise Architect

What Portfolio-level highlight has the role of describing the purpose of the Scaled Agile Framework portfolio?

☒ Portfolio Retrospective☒ Portfolio Value Stream

Portfolio Canvas


☒ Portfolio Kanban

What is used to capture the current state of the Portfolio and a primer to the future state?

Portfolio Canvas☒ Portfolio Backlog☒ Portfolio Kanban

☒ Portfolio Vision

How is the flow of Portfolio Epics managed?

☒ In the Program Kanban☒ In the Portfolio Backlog☒ In the Program Backlog

In the Portfolio Kanban

Which option is a Scaled Agile Framework Portfolio-level highlight?

Lean Budgets☒ Program Increment☒ Economic Framework

☒ Solution Intent

When using the Scaled Agile Framework, what is one benefit of adding synchronization to the cadence of multiple teams?

☒ System-wide development variability is reduced to zero
System-wide demos are possible since all the team demos happen at the same time☒ Each team will work faster since they all start at the same time

☒ Overall work-in-progress is reduced

☒ Remove, or minimize, the implementation time.☒ Remove the development lead and educate a self-organizing team.☒ Have the developers carry out the testing of their own work and remove the testing team completely.

Remove, or minimize, the request wait time and the testing handover time.

You want to store, version, and index binary software artifacts. What type of tool do you use?

☒ Code Repository☒ Linter

Artifact Management Repository


☒ Code Generator

Which is an explanation of the Continuous Delivery Pipeline at the Scaled Agile Framework Program Level?

☒ It encompasses everything needed to go from untested software artifacts to tested software artifacts.
It encompasses everything needed to provide a continuous stream of value to clients.☒ It encompasses everything needed to deploy working software artifacts from a test environment to a production environment.

☒ It encompasses everything needed to go from source code to working software artifacts.

What does the Continuous Delivery Pipeline enable?

Ongoing learning☒ Continuous refactoring☒ Increased technical debt

☒ Delivery of large batches

Why is it important to decouple deployment from release?

☒ To remove the need to respond quickly to production issues☒ To allow inspection of Agile maturity based on different cycle times☒ To make deploying of assets a business decision

To enable releasing functionality on demand to meet business needs

☒ A future view of the solution to be developed, reflecting customer and stakeholder needs.☒ A community of practice is an informal group of team members and other experts.☒ A team that provides assistance in building and using the continuous delivery pipeline.

The specialty roles, people, and services required for the success of an Agile Release Train or Solution Train.

You’re working on a complex multi-component software project and would like to control the variability of the development process. What SAFe mechanism can you employ?

Integration points☒ Stand-up meetings☒ Detailed upfront planning

☒ Decentralized decision making

You are trying to coordinate the architectural runway through different layers, You want to increase velocity in your portfolio. What could you do to accomplish this?

☒ Follow built-in quality practices
Implement enablers☒ Implement epics

☒ Follow QMS guidelines

What is the principal advantage of using objective evaluation of working systems as milestones in the Scaled Agile Framework?

☒ Centralized decisions regarding design and requirements☒ Increased system performance☒ Significantly lower solution bug rate

Risk mitigation

When working with the team backlog, what is the specific function of the Product Owner?

☒ Helping surface problems with the current plan.☒ Investing all their time in developing specific acceptance tests.☒ Holding all features that are planned to be delivered by an ART.

Protecting the team from the problem of multiple stakeholders.

You are an advocate for the Scaled Agile Framework in your organization and are trying to convince your organization that it is in need of change. What type of view could you take to help accomplish your goal?

☒ An immediate view
An economic view☒ A pragmatic view

☒ A business view

What is one benefit of unlocking the intrinsic motivation of knowledge workers?

☒ To centralize decision-making
To provide autonomy with purpose, mission, and minimum constraints☒ To lower work in process (WIP) limits

☒ To strive to achieve a state of continuous flow

☒ Innovation☒ Transparency

Minimum possible constraints


☒ Incentive-based compensation

What can be used as a template for putting SAFe into practice within an organization?

☒ SAFe Principles☒ SAFe Core Values

SAFe Implementation Roadmap


☒ SAFe House of Lean

Which pathway would a LACE use on the Agile growth lifecycle?

☒ The 7 Core Competencies of Business Agility
The SAFe Implementation Roadmap☒ Agile Maturity Roadmaps

☒ The Scaled Agile Framework

What is this statement defining: “A series of activities that have proven to be effective in successfully implementing SAFe”?

☒ SAFe Principles☒ SAFe Core Values

SAFe Implementation Roadmap


☒ SAFe House of Lean

When does a Roadmap become a queue?

☒ When it is longer than one Program Increment
When it is fully committed☒ When it includes no commitments

☒ When it contains Features and not Epics

What is the first step of the SAFe Implementation Roadmap?

Reach the tipping point☒ Create the Implementation Plan☒ Prepare for ART Launch

☒ Coach ART Execution

What are the first three steps of the SAFe Implementation Roadmap?

☒ Train Lean-Agile change agents, train executives, managers and leaders, and then prepare for Agile Release Train launch☒ Reach the tipping point, Train Lean-Agile change agents, and then train the identified support personnel☒ Charter a Lean-Agile Center of Excellence, Train Lean-Agile change agents, and then train executives, managers and leaders

Reach the tipping point, train Lean-Agile change agents, and then train executives, managers and leaders

What are the last three steps of the SAFe Implementation Roadmap?

☒ Train Lean-Agile change agents, extend to the portfolio, accelerate☒ Launch trains, coach Agile Release Train execution, train executives and managers☒ Train Lean-Agile change agents, identify Value Streams and Agile Release Trains, extend to the portfolio

Launch more Agile Release Trains and Value Streams, extend to the portfolio, accelerate

A Team has just adopted the SAFe Implementation Roadmap and is in the process of training executives, managers, and leaders. What is their next step?

Identify Value Stream and Agile Release train☒ Create the Implementation Plan☒ Prepare for ART Launch

☒ Coach ART Execution

An Enterprise has just adopted the SAFe Implementation Roadmap and is in the process of training executives, managers, and leaders. What is their next step?

☒ Train the leaders in Portfolio and Product Management to solve problems before fixing symptoms☒ Perform process mapping on the current state☒ Train Lean-Agile change agents to push out the roadmap and build consensus

Identify Value Streams and Agile Release Trains to start alignment of the organization

Which statement is true about a Value Stream that successfully uses Devops?

☒ It has a technology stack without legacy code☒ It has objective measurements with automation

It has a closed loop process of learning


☒ It has a lower threshold of defects approved to production

Which statement is a principle of the Agile Manifesto?

☒ Measure everything
Simplicity–the art of maximizing the amount of work not done–is essential☒ Visualize and limit WIP, reduce batch sizes, and manage queue lengths

☒ Respect for people and culture

When basing decisions on economics, how are lead time, product cost, value, and development expense used?

☒ To limit work in process (WIP) through the system
To identify different parameters of the economic framework☒ To take into account sunk costs

☒ To recover money already spent

☒ Business Owners assigning the business value☒ Assigning business values to uncommitted objectives

All PI Objectives are given a value of 10


☒ Business Owners assign high values to important Enabler work

What are the three primary keys to implementing flow? (Choose three.)

Manage queue lengths☒ Frequent context switching☒ Increase capacity☒ Address the systemic problems

Reduce the batch sizes of work


Visualize and limit work in process (WIP)

What should the team focus on in order to optimize flow?

☒ Cost☒ Requests

Delays


☒ Results

Optimizing flow means identifying what?

☒ Key performance indicators
Delays☒ Predictability issues of the train

☒ Activities that lack innovation

What is the last step in Kotter’s approach to change management?

Anchor new approaches in the culture☒ Sustain and improve☒ Consolidate gains and produce more wins

☒ Generate short-term wins

Product Management has content authority over the Program Backlog. What do Product Owners have content authority over?

☒ Value Streams☒ Portfolio Backlog☒ Portfolio Vision

Team Backlog

What is the impact of Customer Centricity?

☒ To interpret market rhythms
To understand the Customer’s needs☒ To build small, partial systems just in time

☒ To design custom-built Customer Solutions

How does SAFe describe Customer Centricity?

As a mindset focused on Customer behaviors that produce the best innovations☒ As a set of practices employed to make products focused on the Customer☒ As a strategy to meet the needs of an ever-changing Customer market

☒ As a way of working to include the Customer in daily work processes and planning

What is one issue when organizing around hierarchical functions?

☒ It moves the decision to where the information is☒ It reduces political tensions☒ It creates Agile business teams

It is not how value flows

What is a minimum viable product?

☒ A minimal product that can be built to achieve market dominance☒ A minimal Story a team can deliver in an Iteration☒ A prototype that can be used to explore user needs

A minimal version of a new product used to test a hypothesis

What is Business Agility?

☒ Applying Lean-Agile principles and practices to the specification, development, deployment, operation, and evolution of the world’s largest and most sophisticated systems.☒ How Lean-thinking people and Agile Teams optimize their business processes, evolve strategy with clear and decisive new commitments, and quickly adapt the organization as needed to capitalize on new opportunities.☒ A customer-centric approach to defining, building, and releasing a continuous flow of valuable products and services to customers and users.

The ability to compete and thrive in the digital age by quickly responding to market changes and emerging opportunities with innovative business Solutions.

Which statement accurately characterizes Strategic Themes?

They are business objectives that connect the SAFe portfolio to the Enterprise business strategy☒ They are a high-level summary of each program’s Vision and are updated after every PI☒ They are requirements that span Agile Release Trains but must fit within a single Program Increment

☒ They are large initiatives managed in the Portfolio Kanban that require weighted shortest job first prioritization and a lightweight business case

What is the foundation of the SAFe House of Lean?

Leadership☒ Relentless improvement☒ Value

☒ Flow

☒ Relentless improvement
Innovation☒ Flow

☒ Respect for people and culture

☒ Relentless improvement
Innovation☒ Flow

☒ Respect for people and culture

Which pillar in the House of Lean focuses on the Customer being the consumer of the work?

☒ Innovation☒ Value☒ Flow

Respect for People and Culture

Which Pillar in the House of Lean encourages Learning and Growth?

☒ Innovation☒ Flow

Relentless Improvement


☒ Respect for People and Culture

What is the goal of the House of Lean?

☒ Lean-Agile Leadership as an organizational culture
Value with the shortest sustainable lead time☒ Aligning principles and values to a fixed cause

☒ Building a Grow Lean Mindset as opposed to Fixed Mindset

What is the best measure of progress for complex system development?

☒ Inspect and Adapt
System Demo☒ Prioritized backlog

☒ Iteration Review

What is the main reason for System Demo?

☒ to provide an optional quality check
To enable faster feedback by integration across teams☒ To fulfill SAFe PI Planning requirement

☒ To give product owner the opportunity to provide feedback on team increment

Which statement is true about the Innovation and Planning (IP) Iteration?

☒ It is used annually when the team needs to refocus on work processes☒ It is used as a weekly sync point between the Scrum Masters

Without the IP Iteration, there is a risk that the ‘tyranny of the urgent’ outweighs all innovation activities


☒ The Scrum Master can decide if the IP Iteration is necessary

What is the foundation of SAFe core competencies?

Lean-Agile Leadership☒ Organizational Agility☒ Continuous Learning Culture

☒ Team and Technical Agility

How many dimensions does the Agile product delivery competency has?

☒ two
three☒ four

☒ five

What are the three dimensions of Lean-Agile Leadership? (Choose three.)

Mindset and principles☒ Emotional intelligence☒ SAFe Core Values

Lead by example

☒ Support organizational change

Lead the change

SAFe’s first Lean-Agile Principle includes “Deliver early and often” and what else?

☒ Decentralize decision-making☒ Apply cadence☒ Apply systems thinking

Deliver value incrementally

What is one Guardrail on Lean Budget spend?

☒ Learning Milestones as objective measurements☒ Spending caps for each Agile Release Train☒ Participatory budgeting

Continuous Business Owner engagement

What is one component of a Guardrail in Lean Portfolio Management?

☒ Allocation of centralized vs decentralized decisions in the Enterprise
Capacity allocation of the Value Stream compared to process mapping☒ Participatory budgeting forums that lead to Value Stream budget changes

☒ Determining if business needs meet the Portfolio Threshold

How does SAFe provide a second operating system that enables Business Agility?

☒ By achieving economies of scale
By focusing on customers, products, innovation, and growth☒ By building up large departments and matrixed organizations to support rapid growth

☒ By creating stability and hierarchy

How does SAFe recommend using a second operating system to deliver value?

Organize the Enterprise around the flow of value while maintaining the hierarchies☒ Reorganize the hierarchies around the flow of value☒ Leverage Solutions with economies of scale

☒ Build a small entrepreneurial network focused on the Customer instead of the existing hierarchies

What can be used to script the change to SAFe?

The Implementation Roadmap☒ The Program Kanban☒ The Lean-Agile Center of Excellence (LACE) charter

☒ The portfolio canvas

In the Program Kanban some steps have work in process (WIP) limits. Why is this necessary?

☒ To enable multitasking
To ensure large queues are not being built☒ To help Continuous Deployment

☒ To keep timebox goals

Which statement is a value from the Agile Manifesto?

Respond to change☒ Respect for people and culture☒ Build incrementally with fast, integrated learning cycles

☒ Limit work in process

Which statement is a value from the Agile Manifesto?

☒ Responding to a plan over responding to customer collaboration☒ Responding to a plan over responding to change☒ Responding to change over following a system

Responding to change over following a plan

Which statement is a value from the Agile Manifesto?

Customer collaboration over contract negotiation☒ Customer collaboration over ongoing internal conversation☒ Customer collaboration over a constant indefinite pace

☒ Customer collaboration over feature negotiation

Which statement is a value from the Agile Manifesto?

☒ Customer collaboration over a constant indefinite pace☒ Individuals and interactions over contract negotiation☒ Customer collaboration over following a plan

Individuals and interactions over processes and tools

Which two statements are true about uncommitted objectives? (Choose two.)

☒ The work to deliver the uncommitted objectives is not planned into the iterations during PI Planning☒ Uncommitted objectives are extra things the team can do in case they have time

Uncommitted objectives are not included in the team’s commitment

☒ Uncommitted objectives do not get assigned a planned business value score

Uncommitted objectives help improve predictability

What must management do for a successful Agile transformation?

☒ Send someone to represent management, and then delegate tasks to these individuals☒ Change Scrum Masters in the team every two weeks☒ Strive to think of adoption as an area they can control

Commit to quality and be the change agent in the system

Which of the core competencies of the Lean Enterprise helps align strategy and execution?

☒ Business Solutions and Lean Systems Engineering
Lean Portfolio Management☒ DevOps and Release on Demand

☒ Team and Technical Agility

What is an example of applying cadence-based synchronization in SAFe?

☒ Teams decide their own Iteration length
Teams align their Iterations to the same schedule to support communication, coordination, and system integration☒ Teams allow batch sizes across multiple intervals

☒ Teams meet twice every Program Increment (PI) to plan and schedule capacity

Design Thinking identifies at least four new ways to measure success. What are two of those ways? (Choose two.)

☒ Reliability☒ Scalability☒ Marketability

Sustainability


Desirability

☒ Divergent Feature Decomposition
Empathy maps☒ Solution Canvas

☒ Behavior driven development

Which is an aspect of system thinking?

☒ Mastery drives intrinsic motivation
Optimizing a component does not optimize the system☒ Cadence makes routine that which is routine

☒ The length of the queue impact the wait time

If a program repeatedly shows separate Feature branches rather than a true System Demo, which practice should be reviewed to address the issue?

☒ Test first☒ Roadmap creation

Continuous Integration


☒ Scrum of scrums

Which statement is true about DevOps?

DevOps is an approach to bridge the gap between development and operations☒ DevOps automation of testing reduces the holding cost☒ Measurements are not a top priority for DevOps

☒ Lean-Agile principles are not necessary for a successful DevOps implementation

Which statement is true when continuously deploying using a DevOps model?

☒ It alleviates the reliance on the skill sets of Agile teams☒ It increases the transaction cost☒ It lessens the severity and frequency of release failures

It ensures that changes deployed to production are always immediately available to end-users

What is one key purpose of DevOps?

DevOps joins development and operations to enable continuous delivery☒ DevOps enables continuous release by building a scalable Continuous Delivery Pipeline☒ DevOps focuses on a set of practices applied to large systems

☒ DevOps focuses on automating the delivery pipeline to reduce transaction cost

☒ Every iteration☒ Annually

On demand


☒ Twice annually

What is SAFe’s release strategy?

Release on demand☒ Release continuously☒ Release every Program Increment

☒ Release on cadence

What is one component of the Continuous Delivery Pipeline?

☒ Continuous Planning☒ Continuous Improvement☒ Continuous Cadence

Continuous Exploration

What are three components of the Continuous Delivery Pipeline? (Choose three.)

☒ Continuous Planning☒ Continuous Improvement

Continuous Integration

☒ Continuous Cadence

Continuous Deployment


Continuous Exploration

When is the best time to release software in SAFe?

☒ After every PI☒ After every Iteration☒ As soon as the software meets the Solution Definition of Done

Whenever the Business needs it

Phrase, benefit hypothesis, and acceptance criteria☒ Lean business case☒ Functional requirement

☒ Epic hypothesis statement

During Inspect and Adapt, teams identified a large number of action items aimed at solving their biggest problem as a train. How should the team proceed?

Load all improvement items into the Program Backlog to ensure the problem is documented and solved☒ Select an improvement item using WSJF☒ Identify two or three improvement items and load them into the Program Backlog

☒ Keep all the items and if there is extra capacity in the PI, load as many as will fit into the Program Backlog

The Agile Release Train passes through four steps in order to deliver Solutions which includes: defining new functionality, implementing, acceptance testing, and what else?

☒ Completing phase-gate steps
Deploying☒ Regulatory compliance

☒ DevOps testing

If small batches go through the system faster with lower variability, then which two statements are true about batch size? (Choose two.)

☒ Good infrastructure enables large batches
Proximity (co-location) enables small batch size☒ Batch sizes cannot influence our behavior

Severe project slippage is the most likely result of large batches


☒ Low utilization increases variability

Which statement is true about batch size?

Large batch sizes limit the ability to preserve options☒ When stories are broken into tasks it means there are small batch sizes☒ Large batch sizes ensure time for built-in quality

☒ When there is flow it means there are small batch sizes

Weighted Shortest Job First gives preference to jobs with which two characteristics? (Choose two.)

Higher Cost of Delay☒ Lower Cost of Delay☒ Fixed date

Shorter duration


☒ Revenue impact

During the final plan review, Program risks are addressed using ROAM. What do the letters in ROAM represent?

Resolved, Owned, Accepted, Mitigated☒ Relegated, Owned, Approved, Managed☒ Accepted, Redesigned, Ordered, Mitigated

☒ Managed, Resolved, Ordered, Accepted

Implementing SAFe requires buy-in from all levels of the organization. What level of leadership is most important for effecting cultural change?

☒ Release Train Engineers☒ Solution Management☒ Product Owners

Executive Management

Which two statements describe a Capability? (Choose two.)

☒ It is maintained in the Portfolio Backlog
It must be structured to fit within a single PI
It is written using a phrase, benefit hypothesis, and acceptance criteria☒ It remains complete and becomes a Feature for implementation

☒ It is developed and approved without a dependence on the Solution Kanban

Lifelong learning is a requirement for Lean-Agile Leaders, and it helps them do what?

☒ Provide the personnel, resources, direction, and support to the Enterprise☒ Act as an effective enabler for teams

Demonstrate the values they want the teams to embody


☒ Commit to quality and productivity

How often should System Demos occur in the default SAFe cadence?

☒ Every 4 weeks☒ When requested☒ Weekly

Every 2 week

How often should a System Demo occur?

☒ Every Release☒ Every Week☒ Every PI

Every Iteration

What does the Program Roadmap do in the Scaled Agile Framework?

☒ It provides visibility into the Portfolio Epics being implemented in the next year☒ It describes technical dependencies between Features☒ It communicates the delivery of Features over a near term timeline

It describes the program commitment for the current and next two Program Increments

Peter Drucker defines knowledge workers as individuals who know more about the work they perform than who?

☒ Their coworkers☒ Their team☒ Their organization

Their bosses

Which statement describes the connection between Features and Capabilities in a large Solution?

☒ Some Features may not have parent Capabilities☒ There cannot be more than 5 Features for each☒ Some Capabilities may not have child Features

Every Feature has a parent Capability

What is an example of applying cadence and synchronization in SAFe?

☒ Creating cross-functional teams☒ Using a Portfolio Kanban system☒ Allocating budgets to Agile Release Trains

Conducting a PI Planning meeting

When is a Pre-PI Planning event needed?

☒ When there is only one day to run PI Planning, so more time is needed to prepare to run it effectively☒ When Product Owners and Scrum Masters need to coordinate dependencies within the Agile Release Train

When multiple Agile Release Trains working on the same Solution need to align and coordinate


☒ When teams cannot identify and estimate Stories in PI Planning and need more time to prepare

During PI Planning, who owns Feature priorities?

☒ Business Owner
Product Management☒ Release Train Engineer

☒ Solution Architect/Engineer

During PI Planning, which two tasks are part of the Scrum Master’s role in the first team breakout? (Choose two.)

☒ Review and Reprioritize the team backlog as part of the preparatory work for the second team breakout
Facilitate the coordination with other teams for dependencies☒ Provide clarifications necessary to assist the team with their story estimating and sequencing

Identify as many risks and dependencies as possible for the management review


☒ Be involved in the program backlog refinement and preparation

During the PI Planning event, when are planning adjustments agreed upon?

☒ During the draft plan review☒ During breakout sessions

During the management review and problem-solving


☒ During Scrum of scrums

Why is a confidence vote held at the end of PI Planning?

☒ To remove the risks for the PI
To build share commitment to the Program plan☒ To ensure that Business Owners accept the plan

☒ To hold the team accountable if the Agile Release Train does not deliver on its commitment

Which statement correctly describes one aspect of the team’s commitment at the end of PI Planning?

☒ A team commits only to the PI Objectives with the highest business value
A team does not commit to uncommitted objectives☒ A team commits to all the Features they put on the program board

☒ A team commits to all the Stories they put on their PI plan

At the end of PI Planning after dependencies are resolved and risks are addressed, a confidence vote is taken. What is the default method used to vote?

☒ A vote by team then a vote of every person for the train☒ A vote by every person then normalized for the train☒ A vote by team normalized for the train

A single vote by every person for the train

On day two of PI Planning, management presents adjustments based on the previous day’s management review and problem solving meeting. What is one possible type of adjustment they could make?

☒ Change a team’s plan☒ Create new User Stories

Adjust business priorities


☒ Adjust the length of the PI

On day two of PI Planning, adjustments are made by the group based on the previous day’s management review and problem solving meeting. What are three possible types of changes? (Choose three.)

☒ Adjustment to PI Objectives
Business priorities☒ User Stories☒ Planning requirements reset

Movement of people


Changes to scope

What is part of the role of the Scrum Master?

☒ To prioritize and identify what is ready for Iteration Planning☒ To escalate ART impediments☒ To coach the interactions with the Scrum Framework

To facilitate all team events

Which two behaviors should a SAFe scrum master represent as a Coach? (Choose two.)

Be a facilitator☒ Focus on deadlines and technical options☒ Drive towards specific outcomes☒ Provide subject matter expertise

Help the team find their own way

The Scrum Master is what above all else?

A Servant Leader☒ A team coach☒ A SAFe Agilist

☒ An empathetic leader

☒ Facilitating the Innovation and Planning event☒ Facilitating team events☒ Attending Scrum of scrums

Estimating stories for the team

What is a characteristics of an effective Scrum Master?

Supports the autonomy of the team☒ Articulates Architectural solutions☒ Is a technical expert

☒ Understands customer needs

Which activity is a Scrum Master’s responsibility?

☒ Coaching the Release Train Engineer(s)☒ Owning the Daily stand-up

Coaching the Agile team


☒ Prioritizing the Team Backlog

What does SAFe’s CALMeR approach apply to?

☒ PI Planning
DevOps☒ Economic Framework

☒ Continuous Deployment

What is one way Lean-Agile leaders lead by example?

☒ By applying empathic design and focusing on Customer Centricity
By modeling SAFe’s Lean-Agile Mindset, values, principles, and practices☒ By mastering the Seven Core Competencies of the Lean Enterprise

☒ By using the SAFe Implementation Roadmap to script the way for change

What is one example of differentiating business objectives?

☒ Portfolio Vision☒ Solution Intent☒ Enterprise Goals

Strategic Themes

How can trust be gained between the business and development?

☒ Release new value to production every day
Deliver predictability☒ Maintain Iterations as a safe zone for the team

☒ Automate the delivery pipeline

Which of the following adjectives do you think best describes Agile development?

☒ Adaptive (responds well to change)
☒ Collaborative (requires many hands and minds)
☒ Iterative (repeats the process)
☒ Incremental (adds small pieces of value)
All of the above

Which core competency of the Lean Enterprise helps drive Built-In Quality practices?

Team and Technical Agility☒ DevOps and Release on Demand☒ Lean Portfolio Management

☒ Business Solutions and Lean Systems Engineering

Let’s do some comparisons within SAFe:-